Article Date: 08/30/2004


SEVEN WAYS TO REDUCE CONSTRUCTION CLAIMS


By Dr. Malcolm Lewis, P.E.
CTG Forensics, Inc.

1. Start at the end.

Keep constructibility (buildability, maintainability, and operability) visible from the outset of the project. Identify and eliminate (or minimize) risks early. Pre-engineering study—Review of a 30% basis of design/scope of work document and drawings for completeness and appropriateness to the project application. Value analysis (VA) ... Log in to view the full text.

 



NOT YET A SUBSCRIBER?

Purchase a Subscription
with a money-back guarantee
and immediate access

Already a member?

Email:

Password:











WPL
PUBLISHING CO, INC.
WPL Publishing - 5750 Bou Avenue #1712 - Rockville, MD 20852

Phone: (301)983-0443  -  Fax: (301)983-4367

All Content and Design Copyright © 2026 WPL Publishing
About Us

Contact Us

Privacy Policy

My Account